Pleated metal-fiber candle with an internal support, open upper bore and closed lower end.

Metal fiber felt candle filters for polymer melt filtration

Review the fiber medium, pleat pack and heated housing as a flow system when selecting a filter for polymer melt ahead of spinning or extrusion.

Content checked: 2026-10-30

Define the polymer and heated-housing arrangement first. Confirm temperature, forward/reverse differential-pressure limits, retention, effective area and cleaning acceptance for the proposed element.

Pleated metal-fiber candle — medium and support

Pleated metal-fiber candle — medium and support

Pleated metal-fiber candle — medium and support. Numbered connections, filtering medium, clean passage and closure are identified.

  1. End connection

    The connection and seating must match the melt housing.

  2. Pleated melt-filter medium

    The folded metal-fiber medium is shown with support; usable flow area and pleat geometry require the controlled drawing.

  3. Filtered-melt passage

    The internal support carries the medium while filtered polymer melt enters the bore and flows toward the clean collector.

  4. End closure

    The joint closes the unfiltered bypass route at the end.

Heated polymer-melt candle housing

One selected equipment arrangement is shown to explain position and flow. Verify actual flow, connections, seals and operating sequence against the equipment drawing.

Heated polymer-melt candle housing. Numbered element positions and flow paths; explanations follow in the legend.
  1. Heated housing boundary

    The housing heat system and thermal profile require equipment-level review.

  2. Pleated fiber candles

    Melt flows through the pleated medium and support into the clean passage.

  3. Filtered-melt outlet

    The clean collector leads toward downstream spinning or extrusion equipment.

  4. Candle lower closure

    End closures and seating must prevent a bypass around the filtering medium.

Product images

Where the candle works

Multiple filter candles may connect to a tube sheet or filtrate manifold inside a heated pressure housing. Their role is to intercept specified contamination before downstream spinning or extrusion equipment. Verify whether the proposed housing uses candles, disc stacks or another format before preparing a replacement drawing.

Pleated metal-fiber media combine a three-dimensional pore network with a larger surface area within the cartridge envelope. They are candidates for viscous polymer streams and gel or particle removal. Compare pressure loss, usable area, support and cleaning performance rather than assuming that similarly sized melt cartridges are interchangeable.

Distinguish gels from hard particles

A bonded fiber network provides depth-loading paths; pleats add geometric area within a limited envelope. The useful area also depends on pleat spacing, supports, welds and how the melt reaches the medium. Hard particles, deformable gels and degraded polymer may behave differently under shear and pressure.

A finer label can increase resistance without solving a gel problem. Specify the downstream defect to prevent and assess representative melt or contamination evidence. Flow distribution and stagnant pockets matter because a replacement that creates residence-time problems can generate new degradation deposits.

A melt-filter technical schedule

On a small screen, scroll the table sideways to see every column.

Application specification inputs
ParameterUnit or evidenceWhat to compare
Throughput and melt statekg/h; temperature; viscosity dataState polymer grade, normal range and startup conditions.
Contamination objectiveGel/particle description; test resultSeparate hard-particle retention from deformable-gel control.
Filtration gradeµm with declared test basisCompare removal evidence, not nominal numbers in isolation.
Usable aream² and calculation boundaryExclude covered supports, weld margins and inaccessible pleat zones where applicable.
Pressure loadingbar; temperature-specific limitsSeparate clean loss, terminal forward ΔP and reverse cleaning loads.
Installation and heat exposureDrawing in mm; thermal profileMatch manifold seating, candle spacing, expansion allowance and heated envelope.
Cleaning recoveryMethod; residual contamination; flow testAgree polymer removal, damage inspection and reacceptance.

Match alloy to the polymer and cleaning route

Evaluate 316L only against the actual melt additives, degradation products and regeneration chemicals. Special nickel-based grades can be considered when a defined corrosion or thermal mechanism excludes stainless steel, but fiber availability, weldability and support compatibility must be established for the proposed construction.

Do not adopt a generic high-temperature alloy limit as a melt-filter operating limit. The complete assembly, mechanical loading and exposure time control the decision.

Request a comparable trial and controlled cleaning route

Ask for the element drawing, fiber construction description, material traceability, clean-flow data with fluid conditions, retention basis and forward-load verification. Where service history is unavailable, define a trial measuring pressure rise, defect rate and throughput against the same feed conditions.

Cleaning must remove deposits without opening the structure, cracking welds or distorting pleats. Record the approved sequence and inspection criteria; compare post-cleaning flow and integrity with the original baseline. Burning, chemical dissolution and ultrasonic methods are not interchangeable default instructions.

  • Send the original candle connection and housing arrangement.
  • Identify the dominant defect and how it is measured.
  • Provide the existing cleaning recipe and observed failure mode.

Confirm candle-bank and disc-stack interfaces before replacement

A vertical candle bank and an annular disc stack solve the installation problem differently. A candle review covers the manifold connection, inner and outer supports, filtering layer and locating end closure. A disc-stack review covers the center-post interface, disc support, stack height and clamping arrangement. A shared metal-fiber medium does not make these formats interchangeable.

Some spinning-line applications involve a solvent-containing precursor solution rather than a polymer melt. Identify the actual polymer, solvent if present, concentration and operating state before using a melt-filter specification. Define hard contaminants and deformable gels separately; the selected medium and cleaning procedure need to match the real fluid.

  • Mark normal flow, clean-side outlet and the seating details on the equipment drawing; do not infer flow direction from the element format or a catalog image.
  • For a jacketed disc housing, identify the process cavity and heating circuit separately. Confirm the heat-transfer medium and its conditions without treating jacket pressure as element differential pressure.
  • Agree removal clearance, lifting support and the approved clamping procedure. A hydraulic assembly-tool gauge is not a process-pressure or filtration-resistance measurement.
  • After the agreed cleaning and drying sequence, inspect supports, joints and sealing faces, then repeat the specified integrity and clean-flow checks before reinstalling the element.

Specification and acceptance checks

Approve the complete heated candle assembly, including its manifold connection and usable pleated area. A clean-air media result is not a melt-throughput rating; compare proposals using the same polymer, temperature and contamination target.

On a small screen, scroll the table sideways to see every column.

Procurement checklist for this equipment
CheckSpecifyAcceptance record
Melt applicationkg/h, polymer grade and temperature profileShared feed and viscosity basis
GeometryConnection, heated length, pleat support and spacingControlled candle/manifold drawing
LoadingClean loss and terminal differential pressure at temperatureElement and joint load evidence
ReacceptanceApproved deposit-removal sequencePost-cleaning flow, weld and pleat inspection
  • Separate hard-particle removal from the agreed gel-defect objective.
  • Do not compare permeability values without their test pressure, area and medium.

Typical specifications

On a small screen, scroll the table sideways to see every column.

Polymer melt candles (YS-PC series)
Component / parameterTypical execution
MediaPleated fibre felt, multilayer mesh or sintered powder
ConstructionConnector, inner perforated core, media, outer guard cage, locating end cap
Rating, µm3–100 (βx ≥ 75)
Material316L; 310S on request
Operating temperatureup to 300 °C
Allowable forward ΔPup to 10 MPa (reference; confirmed per design and housing)
Dimensions / connectionto housing drawing (thread, flange or plug-in)
CleaningThermal/solvent cleaning, then bubble-point check

Reference values only; final specifications are confirmed for each custom order.

Prepare the specification for this application

Use these guides to resolve the next selection questions for this element. Each covers a separate part of the specification.

Discuss a candle element for your polymer melt

Start with the polymer and the heated-housing arrangement. Share the available operating data or replacement drawing so the review can distinguish particle retention, gel behavior and hydraulic limits.

Useful if available — these details are optional:

  • Polymer grade, throughput, operating temperature and viscosity information.
  • Description of particles or gels and the downstream quality requirement.
  • Candle and housing drawing, pressure-drop history and the current cleaning method.

Questions before selection

Does more pleated area guarantee longer melt-filter life?

No. Accessible area, flow distribution, contamination, temperature history and terminal pressure limit determine the operating cycle. A geometric-area claim needs a defined calculation.

Can mesh and fiber felt use the same micron rating for substitution?

A shared number is insufficient. Compare the rating method, removal behavior, clean loss, load capacity, cleaning and installation of the complete elements.

Turn the application into a clear element specification

Your inquiry carries this guide, the product family and the application. Add the drawing, process composition, flow basis and known operating conditions; unknown requirements remain open for technical review.

Start an inquiry for this application